Standard Pool Equipment, Decking and Construction

  • All Permits and HOA Approvals Obtained by AquaticTex
  • Fast Excavation by Bobcat
  • All Grass Removed under Decking
  • Four 1/2” Rebar used in Beam of Pool
  • 1/2” to 3/8” Rebar placed 8” on Center throughout Pool
  • 12” x 12” Beam
  • 6” - 8” Thick Walls
  • 8” - 12” Coves
  • Six Sack Mix in Gunite
  • 2” PVC Schedule 40 Plumbing Lines
  • 6 returns or more in Pool per plan
  • 2 Skimmers Separately Plumbed to Equipment
  • 2 Main Drains in Pool
  • 2 Main Drains in Spa
  • Bullnose Brick or Natural Flagstone Coping
  • Frost Proof Tile
  • Accent Tile on Steps, Love Seats and Benches
  • Polyvoid used between Deck and Coping
  • Underground 4” PVC Deck Drains per plan
  • 300 P.S.I. for Decks
  • 3/8” Rebar on 18” Center for Decking
  • One Step Spray Deck Decorative Concrete Finish
  • Overflow Line Where Permitted
  • Two Coat Hand Troweled Marble White Plaster
  • Gunite Equipment Pad
  • Complete Start-up and Instruction by AquaticTex Trained Personnel