Standard Pool Equipment, Decking and Construction
- All Permits and HOA Approvals Obtained by AquaticTex
- Fast Excavation by Bobcat
- All Grass Removed under Decking
- Four 1/2” Rebar used in Beam of Pool
- 1/2” to 3/8” Rebar placed 8” on Center throughout Pool
- 12” x 12” Beam
- 6” - 8” Thick Walls
- 8” - 12” Coves
- Six Sack Mix in Gunite
- 2” PVC Schedule 40 Plumbing Lines
- 6 returns or more in Pool per plan
- 2 Skimmers Separately Plumbed to Equipment
- 2 Main Drains in Pool
- 2 Main Drains in Spa
- Bullnose Brick or Natural Flagstone Coping
- Frost Proof Tile
- Accent Tile on Steps, Love Seats and Benches
- Polyvoid used between Deck and Coping
- Underground 4” PVC Deck Drains per plan
- 300 P.S.I. for Decks
- 3/8” Rebar on 18” Center for Decking
- One Step Spray Deck Decorative Concrete Finish
- Overflow Line Where Permitted
- Two Coat Hand Troweled Marble White Plaster
- Gunite Equipment Pad
- Complete Start-up and Instruction by AquaticTex Trained Personnel
|